top of page

Basements

Expert basement constructions

Piling retaining wall

Stages of Basement construction

The main stages of our basement construction are:

​

  • The site is made safe and secure

  • The basement area is excavated and the excavation made safe to ensure it does not collapse. If necessary, the existing property may be propped up with steel props

  • The basement area is then created either by underpinning or by use of a piling method, Forticrete Stepoc blocks, reinforced concrete walls or a combination of these depending on the design of the basement. Our structural engineer designs the construction method and provides structural calculations. At this stage, the method of waterproofing the basement is also designed in

  • The waterproof shell is then ready to be fitted out to the client’s requirements

Request a Quote

Thanks for submitting!

Office

The Forge

Ockham Lane

Cobham

Surrey

KT11 1LU

01372 451115

Socials

  • Instagram

Enquiries

For any enquiries and to arrange a free quotation please call:

01372 451115 or click the Contact Us button

Home-made signage for office/yard

© 2023 by Dual Piling Ltd

bottom of page